THAT the Council of the Township of North Huron hereby directs staff to prepare a contract of work with Acapulco Pools to complete the scope of work which includes: replace pool liner floor and concrete surfaces with tile, using Laticrete Spectralock PRO epoxy grout, install UV filtration system, install new liner on walls for the contract price of $269,743.00, and further to carry a cash allowance of $5,000 for the installation of an automatic chemical delivery system for the metal removal aggregate, and a project contingency of 10%; for the total project cost of $302,217.30;
AND FURTHER THAT the Council of the Township of North Huron hereby directs staff to use the negotiated method with Cliff’s Heating and Plumbing to solve the HVAC issues at the Aquatic Centre which includes: restoring the original outside air and exhaust air flows in the Dectron Unit, provide additional heating capacity, and install new threaded aluminum hanger and rods and aluminum straps to support the duct system. Staff are directed to bring back a final report on these items with a pricing proposal from Cliff’s Heating and Plumbing;
AND FURTHER THAT the Council of the Township of North Huron recognizes that the entire scope of the project, which included painting the ceiling, replacing sound baffles, will need to be put on hold for 2-3 years until additional funds can be raised to support this project, and another shutdown period will be required to address this part of the project;
AND FURTHER THAT staff are directed not to exceed the budget allocated for the project in 2017.