THAT the Council of the Township of North Huron hereby approve the site plan application (115 Josephine Street, Plan 414, Part Park Lot 7 to Part Park Lot 10, Subject to Sewer Easement, Wingham Ward, Township of North Huron) with the following conditions and a site plan agreement be entered into:
1. this site plan approval applies to the site plan entitled SP-1- Proposed Site Plan, prepared by Agim Mollaj of Armoclan Engineering Ltd., dated June 9, 2017;
2. this site plan approval includes submitted drawings prepared by Agim Mollaj of Armoclan Engineering Ltd., dated June 9, 2017, entitled:
- RA-06 (West and East Elevations)
- RA-07 (North East and South East Elevations)
- EX-01 (Extent of Existing Building Floor Plan)
- EX-02 (Extent of Proposed Existing Building To Be Renovated)
- EX-03 (Existing Building Cross Sections)
- PYS-1 (Proposed Pylon Sign Elevation & Foundation Details)
- L-1 (Proposed Landscape Plan)
- L-2 (Proposed Landscape Notes and Details)
- PAV-1 (Proposed Pavement Plan)
- GP-1-1 (Proposed Floodplain Plan)
- SP-DP (Proposed Site Demolition Plan)
- FRP-1 (Fire Route Plan)
- BVR-1 (Proposed Bulk Vehicle Route Plan)
- ESC-1 (Erosion Sediment Control Plan)
- ESC-2 (Erosion Sediment Control Details)
- M-1 (Proposed Piping Layout)
- M-2 (Proposed Tank, Canopy & Piping Section)
- TSSA (Technical Standards and Safety Authority);
- GP-1 (Proposed Grading Plan)
- GP-1-2 (Proposed Grading Plan Sections)
- GP-2 (Proposed Site Servicing Plan)
- GP-3 (Pre Development Drainage Plan)
- GP-4 (Proposed Development Drainage Plan)
- GP-5 (Storm Design Plan)
3. This site plan approval also includes the submitted documents of:
- Maitland Valley Conservation Authority Permit to Develop in a Regulated Area, No. 20/2017;
- Storm Water Management Study Report for the Property of 115 Josephine Street Wingham, ON Armoclan Project Number: 1313, prepared by Agim Mollaj of Armoclan Engineering Ltd., April 6, 2017.
- Geotechnical Investigation, Proposed Commercial Development, CMT Project 16-069.R01, prepared by Nathan Chortos of CMT Engineering Inc., March 18, 2016.
- Phase One Environment Site Assessment 300038379.1000, prepared by David Marks of R.J Burnside & Associates Ltd., March 2016.
- Buoyancy Calculation, prepared by Containment Solutions, May 10, 2017.
and any conditions contained within the above documents.
4. installation or repair of any curbing or infrastructure works and facilities;
5. providing and maintaining the site grading, drainage of surface waters and storm water management on the lands in accordance with the submitted drawings, and the Engineer’s specifications;
6. all surfacing on the lands is to be complete;
7. all snow is to be removed from entrance/exit driveways and vehicle parking areas and snow is not permitted to be stored underneath the overhead hydro wires located on the north boundary of the subject property;
8. all exterior lighting is to be installed to prevent glare on adjacent properties; and
9. landscaping and planting shall be completed and maintained in accordance with the Site Plan.